MANILA, Philippines — The government is eyeing the filing of charges against the Discayas over poor structural design and unfinished work of the Philippine Film Heritage Building (PFHB) in Intramuros, Manila, Malacañang said Thursday.
Palace Press Officer Claire Castro discovered the sloppy construction of the film center during her inspection of the PFHB that was supposed to be completed Sept. 4, 2025.
Govt eyes charges vs Discayas over 'unfinished' PH Film Heritage Building
Castro said the PFHB was built by the Discaya-owned Great Pacific Builders and General Contractor Inc.
"This building should be turned over now because that it's supposedly finished, Sept. 4, 2025. We can see now how it's built and why it's disappointing," Castro told reporters after inspecting the film center.
"And this building, its contractor is Great Pacific Builders and General Contractor Inc. This is one of the corporations of the Discayas," she added., This news data comes from:http://www.redcanaco.com

Govt eyes charges vs Discayas over 'unfinished' PH Film Heritage Building
- Philippines to work more closely with US amid regional challenges
- Workers urge Marcos to stop corruption by banning political dynasties
- Marcos says commission on DPWH anomalies to be finalized 'very soon,' mum on Magalong participation
- Batangas engineer suspended after alleged bribery attempt on congressman Leviste
- 'Pink and green' protests call for a reset in Indonesia
- Malabon shifts garbage disposal to Rizal landfill after Navotas closure
- Comelec to resume BARMM polls ballot printing Thursday
- No peace without end to hostilities –Arab bloc
- Dizon to order DPWH officials to submit courtesy resignation
- Head of main US health agency abruptly dismissed